Home Additions
New living space with the existing-house connection and site work included in the scope discussion.
Plan the scope →Compare an addition with better use of your existing rooms. Start with the footprint, the house connection, and the decisions that make a project possible.
New living space with the existing-house connection and site work included in the scope discussion.
Plan the scope →Coordinated work across several rooms, with priorities, phasing, and occupancy needs considered.
Plan the scope →Cabinets, counters, layout, and related repairs scoped around your existing kitchen.
Plan the scope →Shower, vanity, tile, and layout changes with the installation responsibilities identified.
Plan the scope →Deck repair, replacement, and patio projects with structure, access, and finishes assessed.
Plan the scope →List activities, furniture, storage, and circulation the addition must support. A bedroom, family room, and multigenerational suite have different privacy and utility needs. Decide which existing rooms could lose daylight or access. Bring a simple sketch with approximate dimensions rather than a finished design.
The first review confirms project fit. Design, engineering, specialist assessments, permits, material selections, and construction responsibilities should be identified in the proposed scope. Availability and a final price require review of the actual property.
Describe the new room purpose, proposed footprint and connection to the existing Lake Stevens house. Include roof, floor and utility tie-ins in the review. Request a remodel alternative where existing rooms could solve the same problem.
Confirm the parcel review, drawings, specialist work and permit responsibilities before construction scheduling. Plan weather protection during the connection phase. A conceptual floor plan is not enough to promise a start date or finished room cost.
Walk circulation, lighting, heating and finish transitions as well as the new room itself. Confirm the contracted inspection and documentation tasks. Keep any outstanding tie-in repair on the completion list so adjacent rooms are not forgotten.
Before buying an addition plan, write down the problem the new room should solve. A larger footprint can be useful, but so can reclaiming an underused room. Organize the first feasibility discussion with these questions.
Use the planning guide →Send your project details and include your location, priorities, and timing.